Technical Production
  • Development of a technical concept
  • Technical documentation and approval
  • Provision with full range of equipment
  • Project implementation
Design
  • Development of event-driven design
  • 2D and 3D visualization of projects
  • Development of a corporate style
  • Preparation of models for production needs
Show
  • Scenario group
  • Director's crew
  • Special staff
  • Turn-key projects development
Multimedia
  • Video content
  • Multiformat 3D-graphics
  • Augmented reality
  • Virtual reality
We create projects from private events to events of federal and international level
We are in the media
18.07.2018

On May 21, the tenth anniversary rhythmic gymnastics festival "Alina" was held at......

31.05.2018

January 17, 2018 in the Adler Arena Sochi hosted a grand event...

IG Team
Day of the city of Domodedovo 2019
Location
Victory Square of Domodedovo
Client
Administration of Domodedovo
Task

For the second year in a row, we have been rendering with great love and building a beautiful, remarkable project - Domodedovo City Day. Thanks to the city administration for the courage, for the good taste, for the openness to the new. The case when we ourselves enjoy the scale of the project and its visual.

Project implementation period
2 weeks
Team
60 people
Corporate event of MegaFon
Location
Crocus Expo
Client
Brooke Event Engineering
Task

The concept of the holiday was the talking slogan - “It starts with you”, which set the tone for the event. This slogan is close to us, so we developed a technical concept, created 3D-render of whole event space, and also prepared technical documentation and made control of services happen during installation and disassembly and during event itself.

Project implementation period
2 weeks
Team
over 50 people
S7 Group Annual Conference 2019
Location
Gymnastics Palace of Irina Viner-Usmanova in Luzhniki
Client
Redday
Task

The annual S7 Group conference was held in an unusual format in 2019 It was a mix of business and entertainment concepts, so the BE S7 turned out to be so interesting and fresh. we fully integrated the setup of the new Mumiy Troll concert show, which became the headliner of the entertainment part of the event, in the official part of the conference Dynamic screens that moved up and down during the event formed various figures, more than 300 lighting devices and 2 thousand people, singing “U-te-khai” in unison.

Project implementation period
2 month
Team
over 50 people
Qiwi Corporate Event
Location
Main stage
Client
QiWi
Task

The concept of the holiday, called “Light house”, was built on lighting effects and the light beacon became the center of attraction for the guests of the event. We, as usual, rendered all this beauty, built it, put it into operation, controlled it, took it apart.

Project implementation period
2 weeks
Team
50 people
Gastronomic evening in a mansion on Volkhonka
Location
Mansion on Volkhonka Street
Task

New Year's ballet magic on the main scene and visual projection onto tables in the of The Nutcracker’s style became a bright continue of the performance outside the stage. Therefore, aesthetics is also about us.

Project implementation period
December 14, 2019
Team
50 people
Corporate project of Vimpelcom
Location
Volynskoe Congress Park
Client
Vimpelcom
Task

It was far from the sunniest day, but 800 people gave the heat, and we built a bright colorful picture

Project implementation period
4 months
Team
more than 50 people
The 11th Continental Hockey League season closing ceremony
Location
Barvikha Luxury Village
Task

If cowards play hockey, then definitely not in the KHL. The 11th Continental Hockey League season closing ceremony was held at the Barvikha Luxury Village concert hall on May 28. Broken lines and an asymmetric concept gave a “tough", masculine character to the scenography. In general, everything went as planned.

Project implementation period
May 28, 2019
Team
over 70 people
Victory Day, the city of Domodedovo, May 9, 2019
Location
Domodedovo Square 30th anniversary of the victory
Client
Administration of Domodedovo
Task

May 9, the city of Domodedovo, which has already become our hometown, we built up (and before that, of course, rendered) a site for celebrating Victory Day of the Great Patriotic War! The most important of all the facts about the event is that among thousands of spectators there were veterans. The Great Victory came 74 years ago thanks to these people

Project implementation period
1,5 month
Team
about 60 people
SAP NOW 2019
Location
VDNKH
Client
Redday
Task

We could write that a crowd of people was involved here, a huge amount of equipment, there were kinetic balls and lasers that were synchronized and controlled by time-code, we could say that before we put the concept into practice, we had a lot of time on its development and rendering We could. But we decided not to write about it, but simply to show you these photos and videos, let them say everything for us.

Project implementation period
about 6 months
Team
more than 80 people
The M.Video-Eldorado Group New Year event
Location
Expocenter
Task

The M.Video-Eldorado Group New Year event was held in the Forum pavilion of the Expocenter On December 21. The theme of the holiday was chosen "90th", and we developed the corresponding "pixel" scenography, and to raise the "cherry nine" and the artists on stage were used plunger. The preparation of the event took about 3 months. During the installation about 80 people were involved. More than 2000 people became guests of the holiday.

Project implementation period
3 month
Team
80 people
A summit of Russian experts in aesthetic medicine
Location
Task

In late February, a summit of Russian experts in aesthetic medicine was held at the Congress Park Radisson Royal Moscow. We developed the concept of the main conference hall, trying to create an atmosphere of 360 degrees of audience coverage. The desired effect was achieved by installing multiple plans for LED screens and semicircular diode walls.

Project implementation period
Team
the Annual Conference of the S7 Group 2018
Location
Expocenter
Task

On December 21, the Expocenter hosted one of our favorite projects - the Annual Conference of the S7 Group 2018. The IG-Pro team has developed a technical set-up scene, and also carried out comprehensive technical support for the project. The key message of the conference was the word “Together”, and each presentation of the speaker was synchronized with the screen engineering. At the installation of the event was involved 60 people. About 600 guests attended the conference.

Project implementation period
4 month
Team
60 people
New Years corporate party
Location
Tesla Place
Task

In mid-December, a large company New Year's corporate event took place at Tesla Place. We developed visual scenes, 3D rendering and monitored the work of contractors during the project. The event turned out to be large-scale, impressive and energizing!

Project implementation period
3 weeks
Team
80 people
MERLION IT Solutions Summit 2018
Location
School of Management Skolkovo
Client
MERLION
Task

On September 5-7, the Moscow School of Management Skolkovo hosted the MERLION IT Solutions Summit 2018. IG-Pro has developed and implemented the entire visual and technical part of the event. The technical set-up was visually designed as a maze, repeating the concepts of the whole event. This was achieved with the help of diode tubes that were controlled from a video server. Each handset had its own separate address, which made it possible to synchronize the main central screen with the diode tubes around it. About 40 people were involved in the installation of the event, more than 700 people became viewers of the show opening

Project implementation period
Team
40 people
Domodedovo City Day
Location
Domodedovo City
Client
Domodedovo City Administration
Task

On August 25, a solemn celebration of the city’s birthday was held in Domodedovo on Victory Square. The event was divided into day and evening programs, Elena Temnikova and the «Chicherina» group became headliners. IG-Pro has developed a technical concept and a 3D model of the event space. Everything, from exhibition pavilions to a large-scale stage with 6 LED screens, was created under the guidance of our technical directors during whole 5 days period of installation. We would like to thank the administration of the city of Domodedovo for the pleasant teamwork and note their desire to create really interesting, bright, impressive events for their residents. We are always happy to help and are open to cooperation.

Project implementation period
2 weeks
Team
100 people
Presentation IG
Place your info!