Technical Production
  • Development of a technical concept
  • Technical documentation and approval
  • Provision with full range of equipment
  • Project implementation
Design
  • Development of event-driven design
  • 2D and 3D visualization of projects
  • Development of a corporate style
  • Preparation of models for production needs
Show
  • Scenario group
  • Director's crew
  • Special staff
  • Turn-key projects development
Multimedia
  • Video content
  • Multiformat 3D-graphics
  • Augmented reality
  • Virtual reality
We create projects from private events to events of federal and international level
We are in the media
18.07.2018

...

31.05.2018

January 17, 2018 in the Adler Arena Sochi hosted a grand event...

IG Team
Location
Task

Project implementation period
Team
Location
Task

Project implementation period
Team
Location
Task

Project implementation period
Team
Anniversary celebration of a large pharmaceutical company 2018
Location
Adler Arena Sochi
Client
Рharmaceutical company
Task

Our company took part in development and implementation of a technical concept of the event for a staggering client! We have done our work at a high level providing the event with all range of necessary equipment transforming the Adler Arena into a technological and comfortable site.

Project implementation period
less than a month
Team
50 people
Festival of Rhythmic Gymnastics "Alina"
Location
GKCZ “Russia”
Client
Charitable Foundation of A.M. Kabaeva
Task

Participants of the grandiose festival of music and sports are more than 500 children from all parts of Russia, as well as from foreign countries, including Cuba, Japan, Bulgaria. Specific feature of the project in 2014 and 2015 is a huge projection surface. The total area of ​​the video projection is over 500 sq. m. More than 30 powerful video projectors was used.  In 2016, the leitmotif of this festival was the victory in the WWII. The festival attracted more than 500 participants and 5,000 spectators. This year the event was especially beautiful and touching. All the events of rhythmic gymnastics were staged under the songs of the war years and accompanied by a beautiful video series.  In 2017, all screens were made of LED modules in increments of 2, 4 and 8 mm. The main feature of the scenography was a sliding tree, as well as a round LED screen integrated into it. Video set, numbers, costumes, music – all this was linked by a fantastic theme, and the event itself turned out to be fabulously beautiful!

Project implementation period
4 months
Team
more than 800 people
Presentation of a new Porsche Panamera 2016
Location
House Smirnov on Tverskoy Boulevard, a historic mansion of the XVIII century
Client
Porsche Russland
Task

To implement the project, it was necessary to turn the mansion into a Porsche owner's house.  With the help of light, props and decorations, we created the atmosphere of a residential mansion with several zones, including a car display zone, with the car being in a presentation cabinet closed from the viewers' eyes, equipped with a sliding wall consisting of 8 rotating lamellas hiding the premiere – the new Porsche Panamera – from the guests, till the required moment. For the period of this elaborate installation we built a curved ramp (with pre-calculated load), disassembled the historic facade window and installed the car on the podium.  We carefully conducted assembly and disassembly works, so that not a single historical element of the podium gets damaged.

Project implementation period
2 month
Team
more than 50 people
SAP Forum 2017
Location
Crocus Expo
Client
SAP
Task

On April 13, 2017 a greatest business conference of Russia and CIS countries – SAP Forum – took place. IG-PRO carried out a complex technical support of this event, starting from development of a technical concept and ending with its implementation. The issue that faced us was to make spectacular, dynamic, technological event. More than 200 light fixtures, panoramic projection and surround sound helped to create an atmosphere of real outer space.

Project implementation period
3 months
Team
150 people
Opening of Four Seasons Hotel Moscow
Location
Four Seasons Hotel Moscow
Client
Four Seasons Hotel Moscow
Task

The peculiarity of this project became a huge multimedia structure in the form of a building of the hotel made from diode panels with the use of projection plastic material. On this media-house an opening clip was shown reflecting the history of this building.

Project implementation period
4 months
Team
120 people
City festival "Lastochka 2016"
Location
Olympic Complex "Luzhniki"
Client
LH Communications
Task

The IG-PRO company played a role of a technical partner of this event. The most large-scale project of the company in summer 2016 Big territory of site development, food courts, sponsor locations, main scene, independent power supply – large-scale and different works gathered in one working mechanism. More than 10,000 persons became guests of the event.

Project implementation period
4 months
Team
150 people
Ceremonial opening of the "Anzhi Arena" stadium
Location
"Anzhi Arena" stadium
Client
Anzhi Arena
Task

A grandiose show associated with the opening of the "Anzhi Arena" stadium. 2 months of preparation, 2 weeks of installation. 150 persons of maintenance staff. Enormous quantity of sound and light. Very complex stage structures. The biggest 3D display in the world. Laser and fireworks ceremony.

Project implementation period
one and half year
Team
more than 700 people
20 years “Azbuka Vkusa”
Location
Crocus City Hall
Client
Azbuka Vkusa
Task

We have implemented a comprehensive technical support for this event, from the development of a technical concept to its implementation. For the bright start of the celebration, we installed a projection holographic grid, used for video projection. And for the first time in the Crocus City Hall, the “spark effect” was used for the enchanting element of the finale. We express our gratitude to the organizer, the Event Marketing Agency PR-Effect, for the trust.

Project implementation period
3 months
Team
100 people
Conference of the S7 group of companies "Digital Airlines"
Location
Hotel "Renaissance Monarch", Andreevsky hall
Client
S7
Task

The event gathered 450 top managers and heads of business units from all Russia. Highly topical program of the conference with further gala dinner allowed to reach necessary efficiency of the event. The range of our tasks included equipping of the event with a big screen, illumination support and diode backlighting which allowed to submerge the guests into the digital-atmosphere.

Project implementation period
1 month
Team
55 people
Official fan zone of the hockey world championship 2016
Location
Ice Hockey Stadium VTB
Task

From May 6 till May 22, 2016 an official fan zone of the championship was organized in the territory of the Ice Hockey Stadium VTB. In its territory fans could buy tickets for championship matches, watch live broadcast of games on a big screen. In the territory of a fan zone there was a big pavilion in which all those who wish could buy emblems devoted to this tournament.

Project implementation period
5 months
Team
200 people
Grand Opening of the Central Children's Store on Lubyanka Square
Location
Central Children's Store
Client
"Gals-Development” Construction Company
Task

The range of our tasks included the development and implementation of stage space in the main Atrium of the store, installation of light, sound, stage and video projection equipment.  Unique features of the project included the development and creation of a unique kinetic layout synchronized with 3D mapping.

Project implementation period
1.5 years
Team
more than 200 people
Recital of Polina Gagarina "Performance"
Location
Crocus City Hall
Client
-
Task

On February 21 in the concert hall of the Crocus City Hall the first recital of Polina Gagarina "Performance" took place. According to the idea all the scenery plans must be mobile and change constantly. The solution was to apply sliding LED screens (two plans of wing flats) and the main screen, which lifted up and down with the help of computer winches.

Project implementation period
6 months
Team
100 people
Presentation IG
Place your info!